Heavy-duty vehicle fleet used to launch 3,400-ton pedestrian bridge span across the Saigon river
The main steel arch and support frame of the pedestrian bridge over the Saigon river, weighing 3,400 tons, were loaded onto a barge at Dong Xuyen port on the evening of 15/10, preparing for towing to downtown Ho Chi Minh City.