Towing a 3,400-ton bridge span to downtown Ho Chi Minh City
The main steel arch of the pedestrian bridge, shaped like a nipa palm leaf and spanning the Saigon River, will depart Dong Xuyen port at dawn on 18/10. It will travel 124 km to Bach Dang Wharf, arriving on the afternoon of 19/10, for its final assembly connecting the two riverbanks.