Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Thursday, 30/4/2026 | 05:01 GMT+7

Ho Chi Minh City's 30 trillion VND administrative center design

Ho Chi Minh City's administrative center in Thu Thiem spans 46,7 hectares, featuring three symbolic building blocks representing "independence - freedom - happiness," alongside a central square, theater, park, and lake.

In this zone, a prominent feature is the administrative center building, approximately 30 stories high, located at the corner of Mai Chi Tho - To Huu Boulevard. This area is currently fenced off, undergoing site leveling, and partially submerged.

Ho Chi Minh City commenced construction of its new administrative center in An Khanh ward on 29/4, with an investment of nearly 30 trillion VND. The project occupies a 46,7-hectare site at the heart of the Thu Thiem New Urban Area.

Sun Group is investing in this project under a public-private partnership (PPP) and build-transfer (BT) contract. The site boasts a prime location, surrounded by major roads, facing the Saigon river, and directly connecting to the existing city center. Aerial views show that the construction site for the new administrative center has largely completed ground leveling, ready for the main construction phase.

The new Ho Chi Minh City administrative center project comprises four components: the administrative center, a central square, a theater, and synchronized technical infrastructure. It is expected to be completed in two years.

The entire area is planned based on the philosophy "of the people - by the people - for the people," with three functional zones designed to create a modern administrative, cultural, and community space within the core of Thu Thiem.

*]:pointer-events-auto [content-visibility:auto] supports-[content-visibility:auto]:[contain-intrinsic-size:auto_100lvh] R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]">

Functional zone 1, named "of the people," is situated along the Saigon river, measuring approximately 169 meters long and 325 meters wide. Functional zone 2, named "by the people," spans about 3,2 hectares and features a central square and a fountain.

The project area is currently fenced off and undergoing ground leveling, preparing for the main construction items.

Functional zone 3, named "for the people," is the core of the entire project. It includes a large square, the administrative center building, and a theater combined with a conference and performance center. The square, spanning 6,6 hectares and approximately 350 meters long, can accommodate 268,000 to 500,000 people. It is designed to host large-scale events such as national parades and ceremonies.

The administrative center block has a floor area of about 272,000 m2, with a design inspired by the motto "independence - freedom - happiness."

The largest building block symbolizes "independence," representing the foundation built upon the sacrifices of previous generations.

The new administrative building is expected to serve over 8,000 officials, civil servants, and public employees, and welcome 1,500 to 2,000 visitors daily through its "one-stop" system. After administrative hours, the facility is designed to become an open space, continuing urban activities into the night rather than being closed off like traditional office models.

Adjacent to the administrative building is a central park featuring a lake spanning approximately 12 hectares. This area is envisioned as a venue for water music, fireworks, and community activities. The area has largely completed ground leveling, while preserving some natural canals within the overall plan.

Next to the administrative center is a multi-functional theater combined with a conference and performance center, with a capacity of approximately 2,000 seats. The facility is designed to host art performances, conferences, exhibitions, and various community activities.

The spaces within the new administrative center are flexibly planned, combining office functions with community facilities such as parks, libraries, and areas supporting economic and service development.

The new administrative center is anticipated to consolidate scattered key agencies, enhance operational efficiency, streamline procedures, and promote a modern urban governance model. The project will directly connect with the Ben Thanh - Thu Thiem Metro Line 2, aiming to form the core of Ho Chi Minh City's international political, administrative, and financial hub, linking Tan Son Nhat and Long Thanh airports.

Quynh Tran - Le Tuyet

By VnExpress: https://vnexpress.net/thiet-ke-trung-tam-hanh-chinh-30-000-ty-dong-cua-tp-hcm-5068338.html
Tags: Thu Thiem new administrative center

News in the same category

No-number ship wharf relic unveils new look after restoration

No-number ship wharf relic unveils new look after restoration

Hai Phong City has invested nearly 235 billion VND to extensively restore and upgrade the no-number ship wharf (K15 wharf) in Do Son, transforming it into a spacious cultural tourism product with synchronized infrastructure and landscape.

General Secretary, President To Lam: Quang Tri determines 'reach east, spread west' strategy

General Secretary, President To Lam: Quang Tri determines 'reach east, spread west' strategy

The General Secretary, President suggests Quang Tri province strongly develop advantageous economic sectors like marine, energy, and tourism, leveraging the east-west corridor's gateway role to the sea.

Tank successfully salvaged from Quy Nhon sea

Tank successfully salvaged from Quy Nhon sea

After 5 hours of deployment, utilizing additional equipment and vehicles, the military successfully salvaged a tank, weapons, and personal belongings that had been submerged in Quy Nhon sea for 51 years, on the evening of 29/4.

Furniture factory spanning over 4,000 sqm in Ho Chi Minh City destroyed by fire

Furniture factory spanning over 4,000 sqm in Ho Chi Minh City destroyed by fire

Fire erupted in the finished product manufacturing area, quickly spreading to engulf a 4,000 square meter workshop, with thick smoke columns rising high on the afternoon of 29/4.

Ba major expressways simultaneously open before holiday

Ba major expressways simultaneously open before holiday

Ba expressways in the Central, Western, and Southeast regions simultaneously opened on 29/4, contributing to national highway congestion relief and increased inter-regional connectivity.

Many guns, ammunition discovered during tank salvage operation off Quy Nhon coast

Many guns, ammunition discovered during tank salvage operation off Quy Nhon coast

As a tank was salvaged from the Quy Nhon coast on the afternoon of 29/4, authorities discovered numerous guns, artillery shells, bones, and fabric fragments.

Sam Son parking lot owner fined for overcharging tourists

Sam Son parking lot owner fined for overcharging tourists

Nguyen Tuan Truong was fined 15 million VND for charging 200,000 VND per vehicle, five times the regulated maximum.

General secretary and president To Lam attends flag-raising ceremony for national reunification

General secretary and president To Lam attends flag-raising ceremony for national reunification

On the morning of 29/4, General Secretary and President To Lam attended the flag-raising ceremony for national reunification at the base of the national flagpole, within the special national relic site of Hien Luong - Ben Hai banks.

21 rest stops operational on expressway from Ha Noi to Ca Mau

21 rest stops operational on expressway from Ha Noi to Ca Mau

Travelers can now access essential services at 21 rest and vehicle stops along the North-South Expressway, just in time for the 30/4-1/5 holiday.

Mass fish deaths near Ca Mau airport expansion project

Mass fish deaths near Ca Mau airport expansion project

Dozens of aquaculture households report fish deaths for over four months, causing billions of dong in losses, suspected due to saltwater intrusion during the Ca Mau airport expansion project.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies