Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Monday, 27/7/2026 | 05:02 GMT+7

New road traverses Da Lat's greenhouse valley

The Cam Ly - Phuoc Thanh route crosses a high-tech agricultural production zone, connecting the belt road to central Da Lat and alleviating traffic congestion during tourist seasons.

The Cam Ly - Phuoc Thanh route, spanning 8.9 km, links Van Thanh Road (DT725) in Cam Ly ward, Da Lat, with 19 Thang 5 Road in Lang Biang ward, Da Lat. This project, with a total investment of 400 billion VND, commenced construction in August 2023.

The road cuts through a vast greenhouse area in Lang Biang ward, Da Lat. This locality boasts over 10,000 ha of agricultural land, with nearly 2,000 ha utilizing high technology. Production focuses on key crops such as vegetables, flowers, strawberries, and medicinal plants.

This area is also recognized as Lam Dong’s "rose capital," encompassing approximately 720 ha, with an average yield of 1.2 million stems per ha annually.

The project is built to mountain road class III standards, featuring a road surface 6 meters wide. The route runs through specialized agricultural zones and greenhouses in Da Lat.

The road winds along a hillside at its intersection with Ankroet Road (DT722), also known as Mang Lin T-junction. From this point, vehicles can turn right to reach central Da Lat or turn left towards the Dankia - Suoi Vang area, home to attractions like Suoi Vang Lake, Pink Grass Hill, and strawberry gardens.

Approximately 500 meters of the route pass through Da Lat’s characteristic pine forest.

The embankment walls along the road are reinforced with concrete retaining walls, limiting landslides and ensuring safety for all types of vehicles.

The Cam Ly - Phuoc Thanh route concludes at its intersection with 19 Thang 5 Road in Lang Biang ward, Da Lat. After experiencing delays due to land clearance issues, the entire route is now fully open to traffic.

A line of large passenger buses stopped to pick up and drop off tourists at an agritourism site along the route.

The Cam Ly - Phuoc Thanh route connects with the end of Da Lat’s belt road, creating a continuous traffic axis from the city’s west to its north. This project is expected to expand development opportunities, facilitate the transport of agricultural products, flowers, and vegetables, and reduce traffic congestion in the city center during peak tourist seasons.

Location of Cam Ly - Phuoc Thanh road. Graphics: Tam Thao

Nhat Dang - Xuan Huong

By VnExpress: https://vnexpress.net/cung-duong-moi-bang-qua-thung-lung-nha-kinh-da-lat-5101371.html
Tags: Da Lat traffic high-tech agriculture greenhouses Da Lat tourism Cam Ly - Phuoc Thanh Road

News in the same category

Water submerges car wheels on many roads in Ho Chi Minh City

Water submerges car wheels on many roads in Ho Chi Minh City

Heavy rain lasting over an hour caused severe flooding on many roads and residential areas in the western wards of Ho Chi Minh City.

Mimosa pass, a gateway to Da Lat, has a 40 m long road crack

Mimosa pass, a gateway to Da Lat, has a 40 m long road crack

A 40 m long crack, extending almost across one lane of Mimosa pass on national highway 20, is showing signs of widening, posing risks of landslides and road collapse.

Proposal to transfer investigation authority from the Procuracy to the Ministry of Public Security

Proposal to transfer investigation authority from the Procuracy to the Ministry of Public Security

The government proposes not to organize the investigation agency of the Supreme People's Procuracy and to transfer investigation authority to the Investigation Security Agency of the Ministry of Public Security.

Man in critical condition after lightning strike while riding motorbike

Man in critical condition after lightning strike while riding motorbike

A man riding a motorbike was critically injured after being struck by lightning on the afternoon of 25/9, causing him to swerve off the road. He was rushed to the hospital in a severe state.

400-600 ton vehicle convoy tests Vietnam's highest Phuoc Khanh bridge

400-600 ton vehicle convoy tests Vietnam's highest Phuoc Khanh bridge

A convoy of 16-24 vehicles, with a total weight of 400-600 tons, has been mobilized to load test the Phuoc Khanh bridge on the Ben Luc - Long Thanh expressway, ensuring structural safety before its official opening.

Ho Chi Minh City to extend metro line 2 to Tay Ninh

Ho Chi Minh City to extend metro line 2 to Tay Ninh

Two metro sections, part of lines 2 and 2S, will extend along national highway 22 to Tay Ninh instead of stopping at Cu Chi, enhancing regional connectivity.

Why abolish the death penalty for drug trafficking and rape of children under 16?

Why abolish the death penalty for drug trafficking and rape of children under 16?

The government explains that the death penalty has not deterred drug trafficking and proposes abolishing it for the rape of children under 16 to align with criminal policy and international obligations.

National Assembly opens year-end session three days early

National Assembly opens year-end session three days early

The second session of the 16th National Assembly will convene on saturday, 17/10, three days ahead of its usual schedule; delegates will also work on sunday, 18/10.

Many areas to see rain on Mid-Autumn Festival night

Many areas to see rain on Mid-Autumn Festival night

On 25/9, heavy rain is forecast from Nghe An to northern Quang Tri, while Hanoi and most of the northern region will be sunny, and the south central coast, Central Highlands, and southern region will experience localized thunderstorms.

Proposal for over 4,660 billion VND to expand My An - Cao Lanh expressway

Proposal for over 4,660 billion VND to expand My An - Cao Lanh expressway

The My Thuan Project Management Board has proposed adding over 4,660 billion VND to expand the My An - Cao Lanh expressway to four full lanes, including emergency shoulders.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies