Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Tuesday, 29/9/2026 | 16:17 GMT+7

An Giang mandates one-day processing for priority APEC documents

Documents for APEC 2027 will utilize a "green lane" system, with particularly urgent tasks to be received and processed within one working day.

An Giang Provincial Party Committee's Standing Committee issued a directive to accelerate projects for APEC 2027. The committee noted that preparation time is limited, and progress on some projects remains inconsistent, facing multi-sectoral and multi-level challenges.

The province mandates a "green lane" mechanism for all documents, paperwork, procedures, and new issues related to APEC projects. Tasks designated as special priorities must be received and processed within one working day.

Multi-purpose performance hall project for APEC. *Binh Minh*

This mechanism applies only to projects authorized by competent authorities, without independent expansion or application. It also requires transparency and measures to prevent corruption, waste, and special interest groups.

The directive emphasizes, "Administrative procedures must not delay projects. The accountability of leaders must be clearly defined, and any delays caused by subjective reasons will result in disciplinary action."

Phu Quoc is required to complete all compensation, support, resettlement, and land handover operations on schedule. This process must ensure the stable lives, livelihoods, and legal rights of residents whose land is acquired.

Alongside accelerating progress, authorities must promptly detect, warn against, and address any violations during implementation.

Phu Quoc is currently implementing 21 key projects for APEC 2027, comprising 10 public investment projects and 11 projects utilizing public-private partnership (PPP) and business investment models. Major infrastructure includes: the expansion of Phu Quoc International Airport, the APEC convention center, APEC boulevard, provincial road 975, and an urban tram line connecting the airport to the convention center.

The list of projects also includes: reservoirs, the Cua Can and Duong Dong 2 water supply plants, waste and wastewater treatment facilities, undergrounding infrastructure in An Thoi and Duong Dong, a smart operation center, resettlement areas, and two urban areas: Bai Dat Do and Nui Ong Quan.

Ngoc Tai

By VnExpress: https://vnexpress.net/an-giang-yeu-cau-xu-ly-ho-so-uu-tien-apec-trong-mot-ngay-5126289.html
Tags: directive Phu Quoc green lane APEC 2027

News in the same category

Proposal to reduce occupational accident insurance contribution rate to 0.3% until the end of 2027

Proposal to reduce occupational accident insurance contribution rate to 0.3% until the end of 2027

The Ministry of Interior proposes reducing employers’ contribution rate to the occupational accident and disease insurance fund from 0.5% to 0.3% of the salary fund until the end of 2027.

Houses a meter lower than road level as National Highway 13 elevated

Houses a meter lower than road level as National Highway 13 elevated

National Highway 13's roadbed was raised 0,5 m to over one meter, leaving many houses below road level, causing difficult travel and rainwater flooding.

Discovery of 20 sets of remains at Ma Chia area

Discovery of 20 sets of remains at Ma Chia area

After three days of excavation in Ma Chia, Hai Phong, search teams discovered 20 sets of remains and sites indicating mass graves from the French colonial period.

Family of late prime minister Vo Van Kiet donates over 100 mementos to Ca Mau

Family of late prime minister Vo Van Kiet donates over 100 mementos to Ca Mau

Over 100 documents, images, artifacts, and films detailing the life and career of late prime minister Vo Van Kiet have been donated by his family to the Ca Mau Provincial Party Committee Historical Museum.

Unblocking a decade-long land clearance bottleneck at Ho Chi Minh City's eastern gateway

Unblocking a decade-long land clearance bottleneck at Ho Chi Minh City's eastern gateway

Over 2.2 hectares of land, held up by land clearance for more than a decade, is now being compensated by Ho Chi Minh City, paving the way for the completion of Luong Dinh Cua street and a section of the An Phu interchange.

Truck carrying chicks catches fire on Phap Van - Cau Gie expressway

Truck carrying chicks catches fire on Phap Van - Cau Gie expressway

A fire erupted from the rear of a truck transporting chicks on the Phap Van - Cau Gie expressway, rapidly spreading throughout the cargo bay and causing traffic congestion in the area on the evening of 28/9.

House collapses in TP HCM, three trapped

House collapses in TP HCM, three trapped

A mezzanine floor inside a house in Phu Nhuan ward unexpectedly collapsed, trapping three people on the ground floor. Police rescued the victims on the afternoon of 28/9.

Can Tho traffic disrupted by heavy rain, peak tides

Can Tho traffic disrupted by heavy rain, peak tides

Heavy rain coinciding with rising tides caused many streets in Can Tho to flood 20-50 cm deep, leading to stalled vehicles, prolonged congestion, and water inundating residential areas and schools on the afternoon of 28/9.

Archway collapses, severs student's arm

Archway collapses, severs student's arm

An archway in Huong Khe commune collapsed after being struck by a crane, crushing a third-grade student who was being carried by his mother on a motorbike, severing his arm, on the afternoon of 28/9.

Proposal for temporary operation of 62 km of expressway through Lang Son, Cao Bang for Tet

Proposal for temporary operation of 62 km of expressway through Lang Son, Cao Bang for Tet

Around 62 km of the Huu Nghi - Chi Lang and Dong Dang - Tra Linh expressways are proposed for temporary, toll-free operation to serve residents during the 2027 Lunar New Year.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies