Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Thursday, 30/7/2026 | 09:59 GMT+7

Da Nang airport domestic terminal expansion secures over 11 trillion VND

The Da Nang City People's Committee has approved an adjusted investment policy for the renovation and expansion project of Terminal T1 at Da Nang International Airport, with a total capital nearing 11.3 trillion VND.

The Da Nang City People's Committee has approved an adjusted investment policy for the renovation and expansion of Terminal T1 at Da Nang International Airport, a project valued at nearly 11.3 trillion VND. This significant investment aims to boost the terminal's service capacity to 14 million passengers annually. Airports Corporation of Vietnam (ACV) is the investor for this project.

The adjusted decision, announced on 30/7, details the project's financial structure. Of the nearly 11.3 trillion VND total investment, over 1.3 trillion VND accounts for components already completed. The expansion will utilize over 165,000 square meters of land, comprising 122,800 square meters of existing area and an additional 42,000 square meters to be acquired.

The design includes constructing an additional 96,000 square meters of floor space to comprehensively upgrade passenger processing. Upon completion, Terminal T1 will handle 14 million passengers each year, meeting the planned growth in air transport demand.

Beyond the main terminal, ACV's investment extends to a range of auxiliary facilities: an elevated road, a mechanical and electrical (M&E) technical area, a wastewater treatment plant, a multi-story parking garage integrated with commercial services, additional parking lots, and an internal traffic system.

Aircraft landing at Da Nang International Airport, April 2025. Photo: Nguyen Dong

The project is anticipated to span 41 months. Following the completion of investment preparation procedures, construction is slated to commence in August 2027. The expanded terminal is expected to become operational by January 2029, with the full renovation of the existing terminal concluding in August 2029.

In a related development, ACV began the expansion project for International Passenger Terminal T2 on 19/5. This project, with a capital of nearly 1.5 trillion VND, will increase T2's capacity to 6 million passengers annually, helping to alleviate overcrowding and uphold 5-star service standards.

Nguyen Dong

By VnExpress: https://vnexpress.net/hon-11-000-ty-dong-mo-rong-nha-ga-quoc-noi-san-bay-da-nang-5103191.html
Tags: Da Nang International Airport Da Nang

News in the same category

National Assembly urged to provide supreme oversight of power development plan VIII implementation

National Assembly urged to provide supreme oversight of power development plan VIII implementation

The Ministry of Industry and Trade has proposed that the National Assembly exercise supreme oversight over the implementation of the adjusted Power Development Plan VIII to accelerate key projects and address delays.

Trucks collide on Thang Long Bridge, two drivers trapped

Trucks collide on Thang Long Bridge, two drivers trapped

Two trucks collided head-on on Thang Long Bridge, severely damaging their cabins and trapping both drivers for over an hour on the morning of 30/7.

Abandoned Sheraton Phu Quoc resort project ordered dismantled

Abandoned Sheraton Phu Quoc resort project ordered dismantled

The Sheraton Phu Quoc Resort project, left unfinished and abandoned for many years, has had its operations terminated, with the investor required to dismantle the structures within four months.

Deputy prime minister: maintain stability in high school graduation exam plan

Deputy prime minister: maintain stability in high school graduation exam plan

Deputy Prime Minister Le Tien Chau instructed the education sector to maintain a stable high school graduation exam plan, enhance supervision to prevent fraud, and cautiously prepare for computer-based testing.

Verification of information regarding 17 sets of suspected martyrs' remains

Verification of information regarding 17 sets of suspected martyrs' remains

The Da Nang City Military Command is conducting surveys and gathering witness testimonies in Hiep Duc commune to verify the origin of 17 sets of remains believed to be those of martyrs.

Dismantling bunkers in Hue Imperial City

Dismantling bunkers in Hue Imperial City

The Hue City Military Command will dismantle 31 bunkers and combat structures within the Hue Imperial City, restoring the monument's original appearance.

Two portraits found in unidentified martyr's grave

Two portraits found in unidentified martyr's grave

A leather wallet containing photos of a woman and a man was discovered in a grave in Quang Ngai, potentially offering clues to identify the fallen soldier.

Bus carrying 40 passengers catches fire on Nha Trang coastal road

Bus carrying 40 passengers catches fire on Nha Trang coastal road

A 45-seat bus carrying approximately 40 people caught fire while traveling on Pham Van Dong street, but the driver managed to evacuate all passengers before the flames engulfed the vehicle on the morning of 29/7.

Piece of tarp with handwritten notes found in martyr's grave

Piece of tarp with handwritten notes found in martyr's grave

During the excavation of an unidentified grave at Nui Nai Martyrs' Cemetery, authorities discovered a tarp bearing handwritten text.

Eliminating the mindset of 'convenient for officials, difficult for people'

Eliminating the mindset of 'convenient for officials, difficult for people'

VnExpress introduces the speech by General Secretary and President To Lam at the national conference to study, grasp, and implement the resolution of the 14th Party Central Committee's third plenum, on 29/7.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies