Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Wednesday, 12/8/2026 | 00:07 GMT+7

Quang Ngai proposes new road to bypass landslide-prone Vi O Lac Pass

Quang Ngai province plans to construct a new 14-kilometer road to circumvent the frequently landslide-affected Vi O Lac Pass, aiming to reduce travel time by approximately 7 kilometers.

On 11/8, Nguyen Phuc Nhan, Director of the Quang Ngai Department of Construction, announced that the department is collaborating with consultants to finalize the feasibility study report for the project to upgrade National Route 24. This vital route connects eastern Quang Ngai with its western region, extending towards areas historically associated with Kon Tum.

The winding pass on National Route 24 connecting Quang Ngai with Kon Plong and Mang Den. Photo: Doan Vuong Quoc

The preliminary plan suggests a new nearly 14-kilometer road connecting two key points, rather than widening the existing 21-kilometer section from Ba Vi commune to Po E bridge. This new approach aims to address the challenges posed by the current route.

The existing road traverses Vi O Lac Pass, characterized by high mountains, steep slopes, numerous curves, and deep ravines. During the rainy season, this area experiences frequent landslides, damaging the road and disrupting traffic. Expanding the current route would necessitate extensive terrain intervention, including significant work on embankments and steep sections.

In contrast, the proposed new route primarily crosses low hills and several small streams. The design will allow for controlled gradients, optimal curve radii, a robust roadbed structure, efficient drainage systems, and appropriate bridge placements. Once completed, the new route is expected to shorten the journey by approximately 7 kilometers.

National Route 24, spanning about 225 kilometers, serves as a crucial artery connecting Quang Ngai with the northern Central Highlands. It passes through the Mang Den tourist area, a destination Kon Tum province aims to develop into a national tourist area.

Following an administrative merger, this national highway became the sole route connecting eastern and western Quang Ngai. Despite increased travel demand, the approximately 58-kilometer section from Ba Vi commune to Kon Plong remains narrow, featuring dangerous passes, steep slopes, sharp curves, and frequent landslides.

In April, the Quang Ngai Provincial People's Committee approved the investment policy for the National Route 24 upgrade project, allocating a total capital of 2,350 billion VND. The project encompasses areas within Ba To district, including Ba To, Ba Dinh, and Ba Vi communes, and extends towards Kon Plong. The entire upgraded route is projected to be 48 kilometers long, approximately 10 kilometers shorter than the existing road, with a width of 9 meters, an increase of about 3 meters from its current state.

Pham Linh

By VnExpress: https://vnexpress.net/de-xuat-lam-duong-noi-mang-den-tranh-deo-vi-o-lac-thuong-sat-lo-5107839.html
Tags: Kon Plong Mang Den Quang Ngai Vi O Lac Pass bypass Vi O Lac Pass

News in the same category

Businesses face slow sales as king tide reaches its peak

Businesses face slow sales as king tide reaches its peak

Businesses saw few customers and daily life for residents in the Thanh Da area was disrupted on the afternoon of 11/10, as the king tide was forecast to reach its peak.

Securities, social media, and livestream selling accounts must link VNeID by 31/12

Securities, social media, and livestream selling accounts must link VNeID by 31/12

The government mandates that digital transaction accounts on platforms for securities, telecommunications, e-commerce, and social media must be linked with VNeID by 31/12/2026.

Master sculptor shapes hundreds of Non Nuoc stone statues

Master sculptor shapes hundreds of Non Nuoc stone statues

After graduating from the Sculpture Department, Nguyen Van Nho became one of the few artisans in Non Nuoc village specializing in sculpting clay models with precise human anatomical proportions.

Hmong people at the foot of Hoang Lien Son mountains embrace tourism

Hmong people at the foot of Hoang Lien Son mountains embrace tourism

After dinner, Cu A Long of Lao Chai village, Khun Ha commune, gathered his family and announced his plan to borrow money to build a homestay for tourists.

Fireworks light up to celebrate Hanoi's liberation day

Fireworks light up to celebrate Hanoi's liberation day

At Hoan Kiem lake and West lake, high-altitude and low-altitude fireworks, combined with pyrotechnics and music, attracted a large crowd of residents and tourists on the evening of 10/10.

Elderly man lost almost 800 km

Elderly man lost almost 800 km

A 69-year-old man from Dong Nai wandered to Dien Ban Tay commune, Quang Nam, with injuries; police and residents helped him return home safely.

Bien Hoa experiences highest tide in 26 years

Bien Hoa experiences highest tide in 26 years

The Dong Nai River's high tide on the afternoon of 10/10 reached 2.2 meters, the highest level recorded since 2000, causing water to overflow embankments and inundate numerous roads and residential areas.

38 wards and communes in Ho Chi Minh City face water cuts or low pressure tonight

38 wards and communes in Ho Chi Minh City face water cuts or low pressure tonight

Maintenance at the Tan Hiep water plant will disrupt water supply or cause low water pressure in 38 wards and communes across Ho Chi Minh City from 9 PM on 10/10 until 5 AM the following day.

Pickup truck driver ticketed for roof-mounted lights in Da Nang

Pickup truck driver ticketed for roof-mounted lights in Da Nang

A Ford Ranger Raptor, equipped with roof-mounted lights, caused glare for other drivers; the 32-year-old driver was ticketed and faces a fine of one to two million dong and a deduction of two points from his license.

Design for a 6,300 billion VND elevated road through southern Ho Chi Minh City

Design for a 6,300 billion VND elevated road through southern Ho Chi Minh City

The 3,66 km Binh Tien bridge-road project, primarily an elevated design crossing two major canals, will feature parallel roads and multiple ramps, with completion anticipated in 2028.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies