Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Thursday, 17/9/2026 | 00:12 GMT+7

Relocating nearly 200 trees for the Ring Road 2 three-level interchange

Approximately 186 trees along Pham Van Dong Boulevard are being transplanted or cut down to prepare the site for the Ring Road 2 three-level interchange in Ho Chi Minh City.

The Management Board of Investment and Construction of Ho Chi Minh City Traffic Projects (TCIP) is overseeing the management of approximately 186 trees within the Ring Road 2 project area. This action prepares the site for the construction of the Pham Van Dong interchange.

Of these, about 45 trees are being carefully transplanted for replanting. The remaining trees, deemed difficult to recover, are being cut down. This preparatory work is mostly complete, clearing the area for the relocation of electricity, water, and telecommunications infrastructure before construction begins.

The investor and related units are also preparing comprehensive traffic management and diversion plans for the area once construction commences.

A tree being cut down for the Ring Road 2 project in Ho Chi Minh City. *Photo: Ha Giang*

The new interchange is situated on section two of Ring Road 2, traversing Pham Van Dong, Kha Van Can, and Linh Dong routes, within Hiep Binh Ward, Thu Duc City. This section spans about 2,5 km, connecting the Binh Thai intersection on Vo Nguyen Giap Street to Pham Van Dong, with a total investment exceeding 4.500 billion VND.

Pham Van Dong is a major traffic artery in the northeastern gateway of Ho Chi Minh City. It connects Tan Son Nhat Airport with National Highway 1, National Highway 1K, and routes leading to Binh Duong and Dong Nai provinces. Due to heavy traffic volume, the intersection with Ring Road 2 is identified as a vital hub within the city's eastern transport network.

In its initial phase, the interchange will feature three distinct levels. The uppermost level will host the main overpass for Ring Road 2, designed with 6-8 lanes, splitting into two branches to cross Pham Van Dong, Linh Dong, Kha Van Can, and Rach Ngang.

A separate two-lane bridge will allow vehicles from Ring Road 2 to turn right onto Pham Van Dong towards Tan Son Nhat Airport. Below, a two-lane underpass will accommodate traffic from Pham Van Dong (Tan Son Nhat direction) turning left onto Ring Road 2 to connect with National Highway 1.

The project site is being acquired to its full width of 67 m. Initially, two parallel roads will be constructed, each featuring three lanes, along with sidewalks and technical infrastructure systems. A 31 m wide median strip will be reserved for future expansion of the route.

The Ring Road 2 - Pham Van Dong interchange area being prepared for construction. *Photo: Giang Anh*

Connecting to this section is section one of Ring Road 2, which is over 3,5 km long. It stretches from Phu Huu Bridge to Vo Nguyen Giap Street at Binh Thai intersection, with an approximate total investment of 9.328 billion VND. This project also includes the construction of two parallel roads and a multi-level interchange at Binh Thai.

Ho Chi Minh City's Ring Road 2, approximately 64 km long, encircles the inner city. Although planned nearly 20 years ago, only about 50 km have been completed to date.

In addition to the two sections currently under implementation, section three, over 2,7 km long from Pham Van Dong to Go Dua intersection, has been under construction for nearly 10 years under a Build-Transfer (BT) contract but remains unfinished due to various issues. The city aims to complete all three sections by 2027, thereby closing the eastern part of Ring Road 2.

The remaining section in the southern part of the city, about 5,3 km long, connects National Highway 1 with Nguyen Van Linh Street, and has not yet received investment.

Giang Anh

By VnExpress: https://vnexpress.net/di-doi-gan-200-cay-xanh-lam-nut-giao-ba-tang-vanh-dai-2-5121057.html
Tags: cutting down trees tree relocation Ho Chi Minh City Ring Road 2 News Ho Chi Minh City traffic

News in the same category

Two months of 'eye of god' cameras capture nine elephants in Da Nang

Two months of 'eye of god' cameras capture nine elephants in Da Nang

Cheers erupted in the Da Nang Special-Use Forest Management Board's office as a computer screen displayed a video of a herd of nine wild elephants traversing a valley.

Over 47% of job seekers in Hanoi are aged 35-54

Over 47% of job seekers in Hanoi are aged 35-54

Middle-aged workers account for over 47% of job seekers in Hanoi, followed by the 25-34 age group at approximately 37%, and the younger 15-24 age group at 14%.

Prime minister demands complete resolution of textbook shortage in shortest time

Prime minister demands complete resolution of textbook shortage in shortest time

Prime minister Le Minh Hung demanded immediate, specific, thorough, and complete resolution of the textbook shortage in the shortest possible time.

Boat carrying 10 people capsizes on river during flood

Boat carrying 10 people capsizes on river during flood

A motorboat transporting 10 people across the Hoi Nguyen River became entangled in a rope and sank in floodwaters, but all individuals were safely brought ashore.

Phu Tho province vice chairman Nguyen Huy Ngoc expelled from the Party

Phu Tho province vice chairman Nguyen Huy Ngoc expelled from the Party

Nguyen Huy Ngoc, vice chairman of Phu Tho provincial People's Committee and former director of the provincial Department of Health, has been expelled from the Party by the Secretariat for very serious violations.

Deputy Minister of Health Tran Van Thuan expelled from party

Deputy Minister of Health Tran Van Thuan expelled from party

Tran Van Thuan, Deputy Minister of Health and chairman of the National Medical Council, has been expelled from the party by the Secretariat due to violations causing very serious consequences.

An Giang recovers over one billion dong in overpayments from staff streamlining

An Giang recovers over one billion dong in overpayments from staff streamlining

After reviewing over 3,200 staff streamlining dossiers, An Giang discovered 35 individuals were overpaid more than one billion dong, while 26 others received a similar amount less than due.

Car crashes into multiple motorbikes at red light in Ho Chi Minh City

Car crashes into multiple motorbikes at red light in Ho Chi Minh City

A Mercedes car crashed into three motorbikes stopped at a red light in front of Tan Binh industrial park, injuring two people, at noon on 16/9.

Three individuals rescued after three-day ordeal in Phu Tho cave

Three individuals rescued after three-day ordeal in Phu Tho cave

Three individuals who entered Rut Cave in Dzung Tien commune on 14/9 became trapped due to rising water blocking the entrance, and were rescued by police on the morning of 16/9.

An ambulance accident on My Thuan expressway injures four people

An ambulance accident on My Thuan expressway injures four people

An ambulance carrying a patient's body collided with a truck on the Trung Luong - My Thuan expressway, injuring four people and causing a 5 km traffic jam on the morning of 16/9.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies