Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Monday, 20/7/2026 | 15:47 GMT+7

Proposal for over 10,600 billion VND to expand national highway 1 from Da Nang to Vinh Long

The Vietnam Road Administration proposes upgrading twelve bypasses and three interchanges on national highway 1 across eight provinces and cities, covering a total length of 70 km with an investment exceeding 10,600 billion VND.

The Vietnam Road Administration recently submitted a proposal to the Ministry of Construction for investment approval. The project aims to upgrade and expand specific sections of national highway 1, traversing Da Nang, Quang Ngai, Gia Lai, Dak Lak, Khanh Hoa, Tay Ninh, Dong Thap, and Vinh Long.

The project includes upgrading and expanding twelve bypasses. These are: Vinh Dien and Ba Ren bridge in Da Nang; Quang Ngai city (Tra Khuc 2 bridge); Bong Son, Phu My, Ngo May, and An Nhon in Gia Lai province; Song Cau, Tuy Hoa, and Ban Thach in Dak Lak province; Dien Khanh in Khanh Hoa province; and Vinh Long in Vinh Long province.

These bypasses will be developed to grade 3 delta road standards. They will feature a design speed of 80 km/h, four lanes, a 20.5 m wide roadbed, and a 14 m wide road surface.

National Highway 1 in Trang Bom commune, Dong Nai, experiences congestion during peak periods. *Photo: Phuoc Tuan*

Additionally, the project involves investing in three interchanges: Long Kim and Binh Nhut in Tay Ninh province, and the Tan Huong industrial park interchange in Dong Thap province. The Long Kim and Binh Nhut interchanges will be grade-separated, prioritizing traffic flow on national highway 1. The Tan Huong industrial park interchange will be an at-grade intersection, controlled by an artificial intelligence-powered traffic light system.

The total project investment is estimated at 10,650 billion VND. This amount allocates approximately 6,020 billion VND for construction, 2,950 billion VND for site clearance and technical infrastructure relocation, with the remaining funds covering project management, consulting, and contingency costs.

Funding for the project is expected to come from the state budget, as part of the 2026-2030 mid-term public investment plan. Construction is slated to begin in Q3/2027 and is anticipated to be completed in early 2030.

National Highway 1 is a vital North-South transport axis, connecting four major growth hubs: Hanoi, Ho Chi Minh City, Da Nang, and Can Tho. It also links five dynamic regions across the country. Upgrading the existing two-lane bypasses from Da Nang to Vinh Long will help complete national highway 1 according to its master plan, significantly improving the operational capacity of the North-South transport corridor.

Anh Duy

By VnExpress: https://vnexpress.net/de-xuat-hon-10-600-ty-dong-mo-rong-quoc-lo-1-tu-da-nang-den-vinh-long-5099549.html
Tags: traffic expansion National Highway 1

News in the same category

Proposed land use map for seven wards along the Red River

Proposed land use map for seven wards along the Red River

According to the proposed plan, the Red River urban subdivision spans over 11,400 hectares, stretching from Hong Ha Bridge to Me So Bridge, encompassing seven wards: Thuong Cat, Dong Ngac, Phu Thuong, Hong Ha, Bo De, Long Bien, and Linh Nam.

Passenger bus crashes into tractor-trailer, one dead

Passenger bus crashes into tractor-trailer, one dead

A 24-seat passenger bus collided with the rear of a tractor-trailer that had a flat tire on the Phap Van - Cau Gie expressway, killing the assistant driver instantly on the morning of 8/9.

How Hanoi plans to transform the Red River into a development axis

How Hanoi plans to transform the Red River into a development axis

Hanoi aims to designate the areas along the Red River as a green corridor, while simultaneously developing transportation, urban, economic, cultural, and service functions.

Car plunges into pit on Bien Hoa - Vung Tau expressway

Car plunges into pit on Bien Hoa - Vung Tau expressway

A 7-seater car collided with a warning sign and plunged into a road under repair, falling into a manhole and sustaining heavy damage, shortly after entering the Bien Hoa - Vung Tau expressway.

Centuries-old structures around Hoan Kiem Lake

Centuries-old structures around Hoan Kiem Lake

Many French-era buildings around Hoan Kiem Lake remain functional today after numerous renovations, including Ba Kieu Temple, Vu Thach Pagoda, Hanoi Post Office, and the Hanoi Moi newspaper office.

Three proposed locations for a new airport in Can Tho

Three proposed locations for a new airport in Can Tho

A consulting firm has proposed studying three potential sites for a new airport in Can Tho: Tran De, the former southern Soc Trang, and an area about 30 km from the existing airport.

New kitchen inaugurated for highland students in Son La

New kitchen inaugurated for highland students in Son La

Hope Foundation and FPT Japan recently inaugurated a new kitchen for Na Loc students, replacing a dilapidated corrugated iron structure that had been in use for 13 years.

Research on preserving mass graves of nearly 600 martyrs in Le Thi Rieng Park

Research on preserving mass graves of nearly 600 martyrs in Le Thi Rieng Park

Ho Chi Minh City will study designating the area where nearly 600 martyrs' remains were discovered in Le Thi Rieng Park for protection, constructing a memorial, and creating a historical relic dossier.

Nguyen Thanh Nhan nominated for Dong Thap chairman

Nguyen Thanh Nhan nominated for Dong Thap chairman

Nguyen Thanh Nhan, 49, deputy secretary of the Party Committee of Central Party Agencies, has been assigned as deputy secretary of the Provincial Party Committee and nominated to be elected chairman of Dong Thap Provincial People's Committee.

Progressive Fees Proposed to Deter Project Land Hoarding

Progressive Fees Proposed to Deter Project Land Hoarding

Project developers who leave land unused or slowly utilized may face increasing fees over time; land not put into use after 60 months will be reclaimed.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies