Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Wednesday, 30/9/2026 | 12:15 GMT+7

How much does it cost to travel the entire ben luc - long thanh expressway?

Vehicles traveling the full length of the ben luc - long thanh expressway are expected to pay from approximately 112,000 to over 446,000 VND, depending on vehicle type, when the expressway opens completely on the night of 30/9.

According to the Vietnam Expressway Development Investment Corporation (VEC), fees are calculated based on vehicle type and actual distance traveled. All stations along the route will use electronic toll collection (ETC).

For a journey from the Ho Chi Minh City - Trung Luong expressway interchange to National Highway 51, vehicles with fewer than 12 seats, trucks under 2 tons, and buses will pay approximately 111,700 VND. The highest fee, about 446,700 VND, applies to trucks over 18 tons and container trucks 40 feet and above.

The Binh Khanh bridge on the Ben Luc - Long Thanh expressway is preparing for operation. *Quynh Tran*

Previously, about 30 km at both ends of the expressway were already in operation, equipped with a toll collection system. When the remaining section connects, this infrastructure will continue to operate synchronously.

Toll fees by route (Unit: thousand VND, rounded figures)

Vehicle groups include: Group 1 (vehicles with fewer than 12 seats, trucks under 2 tons, buses); Group 2 (vehicles with 12-30 seats, trucks from 2 to under 4 tons); Group 3 (vehicles with 31 seats or more, trucks from 4 to under 10 tons); Group 4 (trucks from 10 to under 18 tons, container trucks under 40 feet); Group 5 (trucks over 18 tons, container trucks 40 feet and above).

Route
Group 1 Group 2 Group 3 Group 4 Group 5
Trung Luong – National Highway 51 (full route) 111,7 167,5 223,4 279,2 446,7
Trung Luong – National Highway 1 5,3 8 10,6 13,3 21,3
Trung Luong – National Highway 50 25,6 38,4 51,2 64 102,5
Trung Luong – Nguyen Van Tao 41,5 62,3 83 103,8 166,1
Trung Luong – Phuoc An 97,8 146,7 195,7 244,6 391,4
National Highway 1 – National Highway 50 20,3 30,4 40,5 50,7 81,1
National Highway 1 – Nguyen Van Tao 36,2 54,3 72,3 90,4 144,7
National Highway 1 – Phuoc An 92,5 138,7 185 231,2 370
National Highway 1 – National Highway 51 106,3 159,5 212,7 265,8 425,4
National Highway 50 – Nguyen Van Tao 15,9 23,8 31,8 39,7 63,6
National Highway 50 – Phuoc An 72,2 108,3 144,4 180,5 288,9
National Highway 50 – National Highway 51 86 129 172 215,1 344,2
Nguyen Van Tao – Phuoc An 56,3 84,5 112,6 140,8 225,2
Nguyen Van Tao – National Highway 51 70 105,2 140,3 175,4 280,6
Phuoc An – National Highway 51 13,8 20,7 27,7 34,6 55,4

According to the traffic organization plan approved by the Vietnam Road Administration, the maximum speed on the main route ranges from 80-90 km/h depending on the section, with a minimum speed of 60 km/h.

Vehicles can travel at a maximum of 90 km/h from the Ho Chi Minh City - Trung Luong expressway interchange to the approach of Binh Khanh bridge. The section from the beginning of Binh Khanh bridge to the end of the Phuoc Khanh bridge approach is limited to 80 km/h; the remaining section to the end of the route allows 90 km/h. Exit and entry ramps have lower speeds than the main route.

Ben Luc - Long Thanh expressway route map. *Hoang Thanh*

Currently, vehicles can only travel to the National Highway 51 interchange and cannot directly transfer to the Bien Hoa - Vung Tau expressway. The interchange connecting the two routes at Tan Hiep is temporarily not open, pending a conclusion from authorities regarding certain items.

The Ben Luc - Long Thanh expressway, commenced in 2014, is nearly 58 km long, passing through Tay Ninh, southern Ho Chi Minh City, and Dong Nai. The project has a total adjusted investment of over 29,500 billion VND, featuring four lanes and two continuous emergency lanes, with a design speed of 100 km/h.

Once fully open, the expressway will allow vehicles from the Mekong Delta to reach Long Thanh without navigating multiple urban roads in Ho Chi Minh City, shortening the journey by over one hour and reducing traffic pressure on the city.

Giang Anh

By VnExpress: https://vnexpress.net/di-het-cao-toc-ben-luc-long-thanh-ton-bao-nhieu-tien-5126595.html
Tags: Ben Luc expressway tolls Ben Luc - Long Thanh expressway southern expressway

News in the same category

Nearly 30 Hy vong bridges connect riverbanks

Nearly 30 Hy vong bridges connect riverbanks

New bridges built in the first nine months of the year are not only present in Can Tho, Dong Thap, and An Giang, but have continuously expanded to Tay Ninh and Vinh Long.

Traffic in TP HCM chaotic after heavy rain

Traffic in TP HCM chaotic after heavy rain

Vehicles were gridlocked for kilometers on many routes leading to central TP HCM after heavy rain on the morning of 30/9.

International passengers at Long Thanh to pay 25 USD service fee

International passengers at Long Thanh to pay 25 USD service fee

International passengers departing from Long Thanh Airport will be charged a 25 USD service fee per person, matching Noi Bai Airport and exceeding Tan Son Nhat Airport by 5 USD.

Fire in an 11th-floor apartment of a condominium in TP HCM

Fire in an 11th-floor apartment of a condominium in TP HCM

Black smoke billowed from an 11th-floor apartment in a condominium in Tan Nhut commune (formerly Binh Chanh district), forcing dozens of residents to evacuate to the ground on the evening of 29/9.

Bien Hoa - Vung Tau expressway develops cracks

Bien Hoa - Vung Tau expressway develops cracks

A section of the Bien Hoa - Vung Tau expressway in Phuoc Tan ward shows multiple cracks and subsidence over approximately 100 m following heavy rain and an embankment collapse along the Buong river.

An Giang mandates one-day processing for priority APEC documents

An Giang mandates one-day processing for priority APEC documents

Documents for APEC 2027 will utilize a "green lane" system, with particularly urgent tasks to be received and processed within one working day.

Proposal to reduce occupational accident insurance contribution rate to 0.3% until the end of 2027

Proposal to reduce occupational accident insurance contribution rate to 0.3% until the end of 2027

The Ministry of Interior proposes reducing employers’ contribution rate to the occupational accident and disease insurance fund from 0.5% to 0.3% of the salary fund until the end of 2027.

Houses a meter lower than road level as National Highway 13 elevated

Houses a meter lower than road level as National Highway 13 elevated

National Highway 13's roadbed was raised 0,5 m to over one meter, leaving many houses below road level, causing difficult travel and rainwater flooding.

Discovery of 20 sets of remains at Ma Chia area

Discovery of 20 sets of remains at Ma Chia area

After three days of excavation in Ma Chia, Hai Phong, search teams discovered 20 sets of remains and sites indicating mass graves from the French colonial period.

Family of late prime minister Vo Van Kiet donates over 100 mementos to Ca Mau

Family of late prime minister Vo Van Kiet donates over 100 mementos to Ca Mau

Over 100 documents, images, artifacts, and films detailing the life and career of late prime minister Vo Van Kiet have been donated by his family to the Ca Mau Provincial Party Committee Historical Museum.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies