Eng English
China 中国人

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
  • Trở lại Thể thao
  • News
Thursday, 1/10/2026 | 16:14 GMT+7

Traffic jam over 10 km from Suoi Tien to Dong Nai Bridge

From morning until noon on 1/10, traffic was heavily congested from Suoi Tien to Dong Nai Bridge, passing through the Tan Van interchange construction site of the Ho Chi Minh City Beltway 3 project.

Starting on the morning of 1/10, over 10 km of Hanoi Highway, from Suoi Tien Tourist Area to Vung Tau intersection, experienced severe congestion. The most affected area was near the Tan Van interchange construction site, part of the Ho Chi Minh City Beltway 3 project.

Vehicles formed long queues on Hanoi Highway and DT 743 road, heading towards Dong Nai Bridge. This area includes several barricaded sections for construction, which has caused prolonged congestion for over one year.

By noon, thousands of container trucks, other trucks, and oto (cars) formed multiple lanes on Hanoi Highway near the construction site and on Dong Nai Bridge, moving at a snail's pace.

Long lines of vehicles were also backed up at the new Mien Dong Bus Station underpass and on Hanoi Highway.

In this area, the road, originally 8-12 lanes wide, has been narrowed to 4 lanes due to ongoing expansion work and construction barricades. This reduction in capacity causes a significant buildup of vehicles.

At the Tan Van interchange, vehicles were almost at a standstill. Many drivers, frustrated, got out to take photos, buy food, and monitor traffic conditions.

Anh Vu, a container truck driver, sat in his cabin, scrolling on his phone and calling friends. "Every time I pass through Tan Van, I dread it because of the severe traffic. Today is even worse; it's been an hour, and I haven't moved 5 km," he stated.

At the foot of the Tan Van overpass, heading towards Ho Chi Minh City, temporary barricades were set up to divert traffic. Accordingly, oto heading towards Dong Nai Bridge were temporarily directed onto the overpass to ease congestion and traffic conflicts at this interchange.

Oto encroached upon the motorbike lanes on Hanoi Highway, exacerbating the congestion.

With no clear path forward, many people were exhausted under the hot sun and dust. After a long wait, numerous motorbikes had to turn back and use service roads within the construction site or weave through lines of container trucks to find an alternative route.

"The construction not only causes daily congestion but also frequently damages the road surface, making it muddy and dusty," said Anh Hoang, a local resident.

From the Tan Van area, the congestion extended to connecting routes such as National Highway 51 and Le Van Duyet in Dong Nai, affecting residents' commutes. By around 15h, the traffic jam had not yet cleared.

Le Ngoc Hung, Deputy Director of the Ho Chi Minh City Management Board of Investment and Construction of Traffic Projects, and the Ho Chi Minh City Beltway 3 project investor, stated that continuous heavy rains in recent days, combined with a very high volume of vehicles, especially trucks and containers, have damaged several road sections at the Tan Van interchange.

These damaged areas have been expanding, prompting the construction unit to carry out repairs to ensure safety. The repairs were mostly completed by late morning today, but the extremely high traffic volume continued to cause congestion.

Location of the Tan Van interchange. *Graphic: Dang Hieu*

National Highway 1, passing through the Tan Van interchange, serves as the eastern gateway to Ho Chi Minh City, connecting Binh Duong with Dong Nai. This area, which already experiences high traffic volume, now faces additional pressure due to the Ho Chi Minh City Beltway 3 interchange construction and frequent repairs on Dong Nai Bridge.

The Dong Nai City Traffic Police Department advised residents to reduce speed, maintain distance, observe carefully, and follow instructions when passing through the area. People traveling via Dong Nai Bridge - Vung Tau intersection - Gate 1 routes should monitor traffic conditions and proactively choose appropriate alternative routes.

Quynh Tran - Phuoc Tuan

By VnExpress: https://vnexpress.net/ket-xe-hon-10-km-tu-suoi-tien-den-cau-dong-nai-5127161.html
Tags: Ho Chi Minh City's eastern gateway traffic jam

News in the same category

Allowances for relatives of people with meritorious service to increase from October

Allowances for relatives of people with meritorious service to increase from October

Relatives of fallen soldiers will receive monthly allowances ranging from over 3 million to 9 million VND as the preferential allowance standard for people with meritorious service increases by 8%.

General Secretary and President: assign major tasks to the most skilled

General Secretary and President: assign major tasks to the most skilled

General Secretary and President To Lam called for flexible talent mobilization, assigning major tasks to the most skilled individuals, not limited by official staffing.

Proposal to reduce Hanoi - Hai Phong expressway tolls to attract container trucks

Proposal to reduce Hanoi - Hai Phong expressway tolls to attract container trucks

To ease congestion on National Route 5, Hai Phong proposes reducing tolls for heavy trucks and container vehicles, encouraging their use of the Hanoi - Hai Phong expressway.

TP HCM expects continued heavy rain until 6/10

TP HCM expects continued heavy rain until 6/10

Ho Chi Minh City is forecast to experience continued heavy rain in the late afternoons and evenings in the coming days, with both coverage and intensity increasing on 5-6/10, raising the risk of flooding in low-lying areas.

Flooding on Phan Huy Ich street, water inundates bus linked to Tham Luong canal construction

Flooding on Phan Huy Ich street, water inundates bus linked to Tham Luong canal construction

A rainstorm on the afternoon of 30/9 caused Phan Huy Ich street to flood over one meter, with water entering a bus, shops, and homes, identified as being related to the Tham Luong canal construction.

Life in Vinh’s apartment complex once known as the 'rich neighborhood'

Life in Vinh’s apartment complex once known as the 'rich neighborhood'

Once dubbed Vinh’s "rich neighborhood" with apartments for officials, intellectuals, and experts, the Quang Trung area is now dilapidated, with many families relocating while awaiting resettlement.

Support for career transition planned for residents in Ba Vi safari project area

Support for career transition planned for residents in Ba Vi safari project area

Sun Group plans to provide vocational training, employment, and product consumption support for residents affected by the ecological tourism complex with a safari in Ba Vi.

Water floods buses, shops after heavy rain in Ho Chi Minh City

Water floods buses, shops after heavy rain in Ho Chi Minh City

A two-hour heavy downpour caused Phan Huy Ich street to flood over one meter deep, with water entering buses and shops, leaving many vehicles stalled and awaiting rescue.

25 party members from publishing, printing, and distribution department disciplined

25 party members from publishing, printing, and distribution department disciplined

The central inspection committee reprimands the publishing, printing, and distribution party cell for the 2025-2030 term and 23 party members; two others are warned.

Numerous flights delayed at Tan Son Nhat due to heavy rain

Numerous flights delayed at Tan Son Nhat due to heavy rain

A heavy downpour on the afternoon of 30/9 caused at least five flights bound for Tan Son Nhat to circle, delayed many other departures, and led to severe traffic congestion around the airport.

Eng English
China 中国人
  • News
  • World
  • Business
  • Entertainment
  • Sports
  • Law
  • Education
  • Health
  • Lifestyle
  • Travel
  • Science
  • Digital
  • Automobiles
FPT Tower, 10 Pham Van Bach Street, Dich Vong Ward,
Cau Giay District, Hanoi, Vietnam
Email: contacts@vnportal.net
Tel: 028 7300 9999 - Ext 8556
Advertise with us: 090 293 9644
Register
© Copyright 2026 vnnow.net. All rights reserved.
Terms of use Privacy policy Cookies